16010 - 1 . Work with the other trades to ensure the material and equipment installed as part on the electrical system will not be in conflict with the installation of material and equipment by the other trade contractors. 0000005420 00000 n EQUIPMENT PROVIDED UNDER ANOTHER DIVISION AND BY OTHERS The Installer of products under Divisions 26, 27, & 28 shall make all system connections required to equipment furnished and installed under another division and by others. Maintenance. NESC (National Electrical Safety Code). Section 16010 Basic Electrical Requirements Part 1 - General Available, on site, at all times during construction. Div. Provide connectors with insulating bushings. FIRE STOPS &SMOKE SEALS FOR WALL & FLOOR SLEEVE APPLICATIONS General: Provide fire stops, and smoke sealant materials for all electrical services penetrating through rated assemblies. Place grout around anchors. Job site and worker safety are the responsibility of the contractor. Comply with the following requirements: Coordinate electrical systems, equipment, and materials installation with other building components. 16010-1 . B. B. Pa>hRjf4L4)@5C'2O4)@5C'^T3}2-IT3}2-Iid>qd|'2.@5C'2& 1? mL|k; mL|%3 mL|E=j2UT362tFMf0j2fXQf62tM4)@5Ch3,IgDT362tZO4)@5Cj3,IDTme>iC5jfXqd>i?j2m4|z7j2Ou|GVvx6p+j6*|orw~~qyri{7g2a AoO{z'ZwoFOP1p(Cs&.8dnvr{x8^|\hyuba4w/Axu (p8g\n4d,K%T?Hd2nZirM0%H K y}?3S}~I4H>_yUuSxIZ C7F"T!5b~Q0; Provide an index chart for identification. Verify all dimensions by field measurements. Remove and replace defective Work. .1 .2 ANSI/IEEE 837, Qualifying Permanent Connections . Existing Construction: All new service penetrations through existing rated assemblies shall be provided with a pipe sleeve and sealant materials. Notification of completion of testing shall be sent to the COMPANY . The lighting design shall have a cross-section of 2,5 mm and a circuit breaker of (1 x 10 A + N) - Minimum wire size shall be 2.5 mm. Use operation and maintenance manuals and video as basis of instruction. Section 16010 Basic Electrical Requirements Part 1 - General 0000001182 00000 n hbbd``b` $V Fg $s6e"A?a)L:= S ` + Provide acoustical caulking to seal the annular spaces between the sleeve and the bare pipe or pipe insulation on each end with one half (1/2) inch caulking all around the annular space. The Engineer shall decide on the item and manner in which the work shall be provided. unless otherwise noted. The Contract Documents are a single integrateddocument, and as such all Specification Sections apply. This instruction period shall consist of not less than five (5) eight (8) hour days. mHs00\%Q` CONSTRUCTION RECORD DOCUMENTS The electrical contractor shall maintain a set of construction record documents during the construction period in accordance with Specification Division 01 Section Project Closeout. Fully qualified and experienced in such work. The work to be done under this Division of the specifications consists of the fabrication, complete in all details, of the Electrical Work, at the subject premises, and all work and materials incidental to the proper completion of the installation, except those portions of the work which are expressly stated to be done by others. @W|$" Room numbers. Floor Pipe Sleeves Applications: Pipe sleeves are required for all new conduit risers passing through floor slabs. 0 11-254 95% Construction Document Submission Phase January 03, 2012 BASIC ELECTRICAL REQUIREMENTS 260000 / = > ? Place grout on concrete bases to provide a smooth bearing surface for equipment. Submittal File Format: File formats for each submittal shall be electronically as follows: Product Data: pdf file format. 1.2 REQUIREMENTS OF REGULATORY AGENCIES AND STANDARDS %%EOF xYsHwy+1pUd}{"!Z@{@\RQ_nM*]/UU-d&|d./lQy6y*)~]#gk6_q_T,@0RldC\EOgO+_nK|at{8u~6}QZ"%USXR_l?v0dHy $6 :r`qoL'mVXlBy~xn{tYi|"ey_jtANNkIA>e{B#(Op N7@{z#/\1a}a\'dD,B:=wT:8BT)v$8 !%KjK\=LOe:. Installer of specialized systems such as Fire Alarms, telecommunication systems, etc. endstream endobj 572 0 obj <> endobj 573 0 obj <> endobj 574 0 obj <>stream endobj Contractor shall furnish manufacturer's electrical equipment of the types and sizes specified which has successfully operated for not less than the past two years, except where specific types are named by manufacturer and catalog number or designation under other Sections of the Contract Documents. 4 | SECTION-16000 1.02 A. OUTAGES For all work requiring an outage, the electrical contractor shall submit an outage request to the UMB Project Manager, using the UMB Standard Request for Outage Form which is available through the UMB Design and Construction Web Site at HYPERLINK "https://www.umaryland.edu/designandconstruction/design-and-construction-documents/umb-standard-project-forms---current-editions/" https://www.umaryland.edu/designandconstruction/design-and-construction-documents/umb-standard-project-forms---current-editions/ The existing mechanical/electrical systems shall remain operational unless turned off by University personnel during the construction of the project. CONCRETE HOUSEKEEPING PADS Provide concrete required for housekeeping pads under Division 23 unless otherwise noted. 264 0 obj <> endobj Necessary cookies are absolutely essential for the website to function properly. SECTON 16010 - GENERAL PROVISIONS 16010 - General Provisions.doc PART 1 GENERAL 1.01 Work Included .1 Provide all labour, materials, equipment, services and supervision required to provide a complete electrical system as listed herein and shown on the drawings. Coordinate requirements for access panels and doors where electrical items requiring access are concealed behind finished surfaces. All communication shall be through this person. Safety procedures. Design Mix: 5,000psi (34.50MPa), twenty eight (28) day compressive strength. SECTION 16010 - GENERAL PROVISIONS SECTION INDEX 1.0 General Conditions 12.0 General Description 13.0 Work Included 24.0 Codes, Inspection, Permits and Fees 35.0 Record Drawings 36.0 Shop Drawings, Samples and Other Submittals 47.0 Coordination 58.0 Minor Modifications 59.0 Guarantee 6 10.0 Approvals, Substitutions, Etc. 4206 0 obj <>/Filter/FlateDecode/ID[<3C9B520689C7864B9A48B04B8892C8F0><70969F182CD17F458CE0C92FB6F87795>]/Index[4188 97]/Info 4187 0 R/Length 96/Prev 405976/Root 4189 0 R/Size 4285/Type/XRef/W[1 3 1]>>stream . endstream endobj startxref "$u D2iH>`:\ &Ea Each section of raceway must contain an equipment grounding wire bonded at each end and sized as required. % PDF DIVISION 16 - ELECTRICAL SECTON 16010 - GENERAL PROVISIONS Table of In addition to the requirements specified in Division 1, the following requirements apply: Protection of Installed Work: During cutting and patching operations, protect adjacent installations. Coordination Drawings: In addition to the requirements of the Specification Division 01 prepare the plumbing part for the coordination drawing effort. Patch, repair and repaint all walls and surfaces cut, penetrated or otherwise disturbed by the work. ?\ 2j0D,xl>Kc2)b01UBu0% ## d X%XIL FINAL CLEANING General: General cleaning during construction is required by the General Conditions and included in Section Temporary Facilities. Install electrical equipment to facilitate servicing, maintenance, and repair or replacement of equipment components. Provide the following, where applicable, in accordance with accepted trade standards and to Owners satisfaction: Replace damaged ceiling tiles. For equipment requiring seasonal operation, perform instructions for other seasons at the same time. Place grout to completely fill equipment bases. 2 0 obj o Approved substitutions, Contract Modifications, RFI responses and actual equipment and materials installed. Installers' qualifications refer to the materials and methods required for the surface and building components being patched. PDF Electrical Performance Specifications Cutting, welding and burning Concrete housekeeping pads Grouting Protection of work Provisions for access Demonstration and instruction Equipment provided under another division or by others Record drawings Closeout procedures Inspections Demolition Repairs and restoration of surfaces and finishes Final cleaning Project punchout Summary of Work: Provide a complete integrated electrical system in accordance with the intent of these specifications and the accompanying drawings. Control. B. The drawings and specifications shall be followed in layout of work. HSMo@Wq~HU8 jPYqz0NAjFgvlwv=~|vjj*5MY}n`yQ?aLu:#heF{L[}:n! /C\_7sHsuHp$c1X?So0u*dMLeqi81cx,B2@(@>Nde7a-KZi:%A o#=drlbI6. Unless otherwise indicated in each specification section, contractors may submit material and equipment by non listed manufacturers provided said submittals meet the requirements of these specifications. Provide forms for placement of grout, as required. Cut, remove and legally dispose of selected electrical equipment, components, and materials as indicated, including but not limited to removal of electrical systems and equipment as indicated on the drawings and specifications and other electrical items made obsolete by the new Work. PDF SECTION 17010 GENERAL REQUIREMENTS, INSTRUMENTATION ICS. - EandM Cleaning: Employ experienced workers or professional cleaners for final cleaning. The mark-ups shall be legibly marked in red pencil to show all changes and departures of the installation as compared with the original design. No additional compensation will be made to the contractor as a result of his failure to familiarize himself with the existing conditions under which the work must be performed. 1.1 GENERAL REQUIREMENTS: A. Unless otherwise modified, provisions of General Conditions, Supplementary Conditions and Division-01 govern work under the Electrical Divisions. Test data for equipment, shielded cables and supply voltage shall be submitted to the District. qZ*`vC+6`tth?P^u^ 'EHC1ZK$q{)Q8E PART 1 - GENERAL . 0000000016 00000 n Obtain all necessary permits from Job No. Unless otherwise indicated the coordination drawings, including plans, sections, and elevations shall be prepared at a scale of not less than 1/4 inch = 1 foot- 0 inches. The contractor shall submit detailed riser diagrams detailing point-by-point connections. **"DHV1WtdRO2hK22K2*3e,jKs'{@Ee^hxNKK9 zBh9 Outages should be scheduled a minimum of ten (10) days in advance. NETA (National Electrical Testing Association). Installers' qualifications refer to the materials and methods required for the surface and building components being patched. Remove and replace Work not conforming to requirements of the Contract Documents. PDF PROPOSED MULTIPURPOSE CENTER - International Organization for Migration Cure placed grout according to manufacturer's printed instructions. Refer to specification Section 16010 - "Basic Electrical Requirements: for complete work scope. NFPA (National Fire Protection Association). E. Test Data . IL?nL"a n[. ["R2VhL"F{V>,r&!#NLefBRD49e6D0u4$KyL !dU00BR0Cv1 n ~F ~ Provide service and operating manuals for the following: Division 28 Section Digital, Addressable Fire Alarm System. This category only includes cookies that ensures basic functionalities and security features of the website.

Cobb Middle School Death, Newman Smith High School Principal, Congruent Triangles Multiple Choice Test Pdf, Articles S